Feasibility studies

What can AquaOmnes achieve with your salty effluents?

The best way to find out is to try it! We can offer you a feasibility study on real samples or simulated water according to your wishes and in accord with your desalted water and/or ultrabrines specifications.

The feasibility study will help you understand the efficiency of the process. This is also a way to get an estimation of the energy requirements and overall costs of a full project.

Depending on the complexity of target goal, a feasibility study normally takes 1 to 2 months.

 

If you are interested in doing a feasibility study, you please contact us.

Pilot plants

After the feasibility study: prototyping up to the pilot plant level

 

The feasibility study is a great tool to assess whether to move on to prototyping and/or piloting. The assessment will be made jointly based on the feasibility results, the type of pilot plant envisioned and the overall nature of the project. Adionics is eager to implement a trial phase on the customer’s site to demonstrate what we can achieve.

 

If you are interested in setting up a pilot plant, please contact us.

 

corporate website
www.adionics.com
chemicals.adionics.com